Proposed DDA Projects:
Phase I (Years 1 –10):
- Speed Limit Signs/Traffic Calming Devices
- Shields Drive Watermain Extension
- Benches/Trash Receptacles
- Shields Drive Road Extension
- Pocket Park
- Banners
- Streetscaping/Landscaping
- Repaving of Gratiot/M-46 (Tittbawassee River to Meijer)
- Bridge Repair
- Crosswalk Improvements
- Pedestrian Walk Over Bridge
- Median Improvements (Meijer to Kennely)
Phase II (Years 11-20):
- West Entrance Sign With Fencing/Pillars
- Gratiot/Kennely Intersection Traffic Signals Light
- Sidewalks and Sidewalk Repairs
Phase II/III (Years 21—30) :
- Banners (Five –Year Replacement Plan)
- East Entrance Sign With Fencing/Pillars
- Utility Line Removal (Tittabawassee River to Miller)
- Shields Drive; Miller Road to Meijer, Lighting and Trees